We have also begun the plumbing work on the new toilets which will be inside the library. Basically, the outside work connecting to the septic tank and the well water supply and the lines running into the building have been completed. The plumber will return when the wall framing is being done for installing the interior piping and the fixtures, etc.
No comments:
Post a Comment